Thursday, November 1, 2018

Decked Out



Completing the sanding on the aft two compartments has led to exciting developments in this area.  Above the mahogany aft deck stringers are fitted and resting on the deck beams.

The aft decks are fitted and attached to the stringers by screws.  Much work remains before the decks are epoxied in place.  The interior surfaces will receive two epoxy coats as well as paint before installation.  The light stringers create a deck that is too springy for my taste.  I'm considering an additional deck beam to better support the longer stringer span.  This led to an attempt to enter a hull and take some under deck measurements.  I placed a piece of lumber under the skeg so my weight would not over tax the hull rotation arrangement suspending the hull from the ceiling.  I climbed onto to a chair and placed one foot into the hull.  This quickly proved to be a less than wise idea as the hull started to rotate with my foot pressure.  A stupid accident story was averted.  Any additional deck beams will have to wait until the hulls are resting on cradles.  

Above is a view through two compartments forward of the dark aft bunk compartment.  These two compartments have the bulkheads tabbed to the hull panels with fiberglassed fillets.  Epoxy fillets are also applied on top of the stringers and along the sides of the butt blocks and backing pads.  The fillets on stringer tops will prevent condensation and debris from collecting in the lower hull panel end grain.  The butt block and backing pad fillets are just to give the hull a more finished appearance.  The above image shows the finished fillets and fiberglassed areas after three days of sanding.  Three days of sanding are ahead to bring the second hull to this state of completion.

Much of my time is spent sanding so I'm doing what I can to make it easier on myself.  I've made two radiused sanding tools to shape raw fillets and a small sanding block for flattening areas.  A piece of neoprene foam conforms to many shapes when wrapped in sand paper.  I've stock piled sandpaper cut to fit the various tools.  Initially the sandpaper was attached with hot glue, but this was not satisfactory and it took a while to change the sandpaper.  Staples are now used to attach the sandpaper.  A groove is cut under the areas where the staples are applied.  This arrangement keeps the staples below the sandpaper surface and prevents the staples from scaring the work.

Possibly my readers find all this talk of sanding tiring, I find it makes my fingers sore.  I've taken to wrapping my finger tips in tape so the bones don't start poking through.  Above is a fiberglassed fillet in the finishing process.  The area below my hand has been finished, the fiberglass edge is blended to the adjacent material while the surfaces are flattened and abraded for the painting to come.  A newly fiberglassed edge is lumpy with sharp skin tearing points that must be removed.  Great pressure and fine control are possible using the sanding block's smallest face to knock down the fiberglass edge.  The block is held at a slight angle to taper the fiberglass edge and blend it in.  Above my hand is an edge beginning in the tapering process.

With a few days of sanding I will have over half of the boat's compartments "finished".  The compartments ahead will be come more involved with designing and fitting two hatches in each hull.  It is likely only be a break from sanding rather than an end to sanding.

Tuesday, October 16, 2018

Then There Were Two

 
Above the upper hull panels are screwed onto the lower hull panels on the starboard (right) hull.  The hull panels are first screwed together to assure proper alignment.  Small plywood squares under each screw head prevent the screw heads from leaving large indents in the hull panels  The day to follow, my faithful helper and I will remove the upper panels and reinstall them with epoxy to bring both hulls up to a similar level of construction.  I found it exciting to have both hulls completed to this level.


At long last the massive epoxy stern fillets are completed and sanded in both hulls.  1 1/4" thick plywood forms the skeg's upper end and is embedded in the fillets.  Fiberglass will be applied over these fillets and then more sanding is in store.


Above the hull has been rotated on its' side facilitating sanding operations on seven fiberglassed fillets in the two aft most compartments.  Fiberglass is initially applied with straight epoxy and as the first coat starts to set up, a second coat is applied to fill the weave.  I add fairing (smoothing) compound to the second coat to ease the sanding following (I'm not sure if this is a recommended practice).  The aft most compartment is a flotation chamber that will rarely be viewed and I let slide the difficult to remove epoxy runs on the previously painted surfaces.   Two days were required to sand the seven fillets and two more sanding days are ahead on the second hull.  With this work completed, exciting progress on this area will come with the next episode.

Creature Comforts


Two years and four air beds later it is past time to invest in an actual bed.  This tall bed features eight drawers in the base and two in the headboard.  I like the fact that it has a modern edge to it rather than the frilly style most often found in Belize.  I don't know about the lime green sheets, but sheets are hard to come by and sometimes you can be happy to come home with anything at all.  I purchased the bed just before I had hernia surgery.  I returned from the hospital to learn it was much too painful to climb up into my new bed for a couple of weeks.  My mind has time to ponder a tall bed's possibilities in a bedroom recreational setting. 


Future guests will also be treated to a tall queen sized bed.  This bed features only four drawers in the base so no one stays too long.  The sheets for this bed came with an ordinarily useless blanket, but the house breaking for my "pet" geckos is not going well and a sheet shield is necessary.


Above is the new guest bathroom complete with light reading materials.  It actually is a composting toilet purchased for the boat.


Above are the inner workings of the composting toilet.  Basically the liquids are funneled into the orange colored hole.  The orange part is a float that rises as the container below fills.  The full container is lifted out and the attached white pipe swivels to form a spout for emptying the container.  The solids drop into a bucket filled with sawdust or other material that will dry the droppings.  A crank is inserted into the lid hole to engage the bucket agitator.  Ten turns on the crank and composting is underway.  No plumbing, wiring or odors are associated with this arrangement.  


I think most people have walked into a living room and found one television set in use on top of a broken set.  I have a different version of that as I have not been able to contact my gas guy for a refill so the stove and hot water services are not available for the present.  I've had breakfast at the resort across the street at US prices for a few mornings.  The poor guy needs some business as I've been the only customer.  This proved to be an opportunity to try out the boat's alcohol stove to great success.

Sunday, September 9, 2018

A Year's Progress

Late in August 2017 I paid for shipping marine plywood and epoxy from the U.S. to Belize.  As I recall this shipment was delivered to my address early in September 2017. This episode marks my first year of progress in the construction of a Tiki 26 catamaran.  Progress for the last two months has been hampered by a hernia and recovery from corrective surgery. My enthusiasm for the project has not waned, but I’m presently limited by what I can do.



This is a view forward from the port hull stern.  In the foreground is the aft floatation compartment followed by the aft bunk compartment with a tall bulkhead providing sitting headroom beyond.  Progress has been made in a number areas here.


A semi-rectangular opening is cut through the tall bulkhead to allow a large ice chest to slide into the aft bunk compartment.  The plans call for a circular opening that is far better in terms of load distribution. Below each end of the deck beam are plywood doublers strengthening the upper areas of the rectangular opening.  These doublers increase the plywood thickness from ¼” to 1\2” and will be joined to the hull/deck beams by a fiberglassed epoxy fillets.


I’ve ordered an opening portlight with fly screens for each hull.  These portlights feature an extruded aluminum frame and smoked acrylic glass.  A full sized paper cut out is taped to the tall bulkhead to judge the best portlight placement.  I think it needs to go a little left of the current position.


The aft most bullhead and the two foremost bulkheads (not visible) were trimmed in height to match deck beams flushed with the hull top edges.  The bulk of this work was accomplished using a router and a patterning bit to follow the deck beam curve. The aft most bulkhead posed the greatest challenge as when the aft deck beam edge is flush with the hull edges,  the forward deck beam edge is 1/16” high of the hull due to the shear (line formed at the hull/deck intersection) sweep. The bulkhead was initially flushed up to the high deck beam edge then a line was drawn down 1/16” down from the newly flushed edge.  A block plane was used bring the bulkhead down to the line and then to flatten the area from the new bulkhead edge to the opposite unmolested deck beam edge. The deck beam to deck face now follows the sheer sweep (or rocker).


The router was also used to open up the deck stringer landings in the aft most bulkhead.  Before long I’ll be fitting the deck stringers and decks. I intend to cut out most ¼” plywood parts before fitting the interiors with some of the scraps.  These parts would include the decks and the cabin sides. I have two extra ¼” plywood sheets in the event of errors.




Before any deck stringers are fitted, the stern fillet needs to be finished.  Above is shown the fillet lacking about three more inches of epoxy. The finished fillet will be about nine inches deep.  It can not be applied in one go as the epoxy heats up as it cures and large masses can heat up to the point of setting things on fire.  The epoxy must be applied in layers and allowed to partly cure before the next layer is applied and only a limited number of layers can be completed in a day.  When allowed to cure, the epoxy must be sanded, to assure good adhesion, before adding more layers.



I’ve purchased a two burner alcohol stove as a gally center piece.  Above I have mocked up a table arrangement utilizing a bunk locker cover.  This compartment will receive shelving and a sink for its’ gally function. A similar table arrangement in the starboard hull will serve for navigation purposes.





The hulls are suspended, fore and aft, from above.  On the right is the original suspension method with the hull resting in straps fixed above.  To rotate the hull, the strap has to slip across the keel and hull surface. This was fine until the weight and added dimensions of the upper hull panels were added and hull rotation became too difficult.

On the left is the new arrangement with the hulls still resting in slings, but the sling ends are attached to a rope passing through the green overhead sheaves.  The slings no longer work against the boat surfaces as the hull is rotated. A midships come along, suspended from above, is attached to a strap leading under the boat and anchored to the opposite hull edge.  Operating the come along lifts the hull as well as inducing hull rotation for those who are hernia tender.

Sunday, July 22, 2018

Transformation


All the bunk panels are installed.  Fillets were made between the panels and the hull to fill the gap and to further strengthen the structure.  The lockers and flloation chambers are painted a bright white as visable in the background hull with the locker covers removed.  The bright white was too intense and sterile for the normally exposed interior.  The interior will be coated with a warmer off white as seen in the companionway compartment.

 The unpainted locker, second from the bow, will require additional work. I intend to install a composting head in one of these exterior lockers and possibly shelving in the other.  I have not yet heard from the head vendor regarding my order, so a Plan B may be needed.

I managed to score a large ice chest that slips neatly into the aft bunk compartment.  The chest lid is hinged parallel to the end so that only a portion of the lid is opened to access the contents.  The chest is shown in the position necessary to open the lid.






The long bench greatly facilitates this second stage in the upper hull panel assembly.  Above the mahogany shear stringer is epoxied to the upper hull panel under the pressure of clamps.  A boat’s shear is the “line” at the hull/deck intersection.


Previously; the plywood hull panels and a short bow panel were joined together with butt blocks on the interior side.  All three butt joins are visible above as the darken areas crossing the shorter dimension. This sub assembly’s overall length measured precisely as the plans indicated.   


It was a bit shocking to fit the upper panel to the lower panel and find it was ¾” too short.  I was further surprised to learn, in my eagerness to get started, I made an assumption that compounded into this condition.  I assumed that my 8’ by 4’ plywood would be 8 feet long, but recent measurements revealed a length of 8 feet, ¼ inch. The three plywood lengths, forming the lower hull are ¾ of an inch too long as a result.  



Above are two hull panels screwed to the bench in preparation for glueing to a butt block.  A ¾ inch wide insert lengthens the second upper hull panel assembly.



The butt block will be screwed in place over the butted insert and panel ends as the epoxy sets.



Both hull panels are fitted to one hull.  This has really transformed the project from a canoe like stage into a boat no doubt stage.  I like the pronounced sheer upward sweeps.

The upper hull panels fit amazing well against the previously established bulkhead marks.  The bulkheads fore and aft of the cabin project above the sheer line as expected. These bulkheads individually project identical amounts from one sheer to the other.  This is beyond what I would ordinarily expect and suggests this hull is straight and true as confirmed by tighten fish lines spanning the length.




The installed upper panels give a better feel for what the interior space will be like.  I give a long pause in using the word spacious, but that is what first came to mind when tainted by previous visualizations of a four foot wide hull.